Cost of Building Two Floors and an Annex in Saudi Arabia: Calculate Accurately with Aqar Calculator
To make this journey easier for you, the Aqar app provides a smart and accurate tool, the “Building Calculator,” to estimate the construction cost of your property in mere seconds.
Building Calculator from Aqar App: Calculate Accurately
-
Enter the total land area in square meters.
-
Specify the required number of floors (e.g., two floors with an annex).
-
Select the desired finishing level to view the cost distribution between the structural phase (Bone) and turnkey delivery.
Cost Details of Building Two Floors and an Annex for Different Areas
1. Cost of Building Two Floors and an Annex on a 400 m² Land Area
| Item / Phase | Details / Cost |
| Structural Phase (Bone) Cost Only | 457,600 SAR[cite: 20] |
| Total Turnkey (Standard Finishing) | 880,000 SAR (Finishing Cost: 704,000 SAR)[cite: 20] |
| Total Turnkey (Excellent Finishing) | 1,320,000 SAR (Finishing Cost: 1,056,000 SAR)[cite: 20] |
| Total Turnkey (Luxury Finishing) | 2,640,000 SAR (Finishing Cost: 1,760,000 SAR)[cite: 20] |
| Ground Floor / First Floor Built Area | 280 m² / 240 m²[cite: 20] |
| Upper Annex Built Area | 120 m²[cite: 20] |
| Fence / Water Tank / Sewage Tank / Pool | 60 m³ / 25 m³ / 25 m² / 80 m²[cite: 20] |
| Total Building Floor Areas | 830 m²[cite: 20] |
2. Cost of Building Two Floors and an Annex on a 600 m² Land Area
| Item / Phase | Details / Cost |
| Structural Phase (Bone) Cost Only | 686,400 SAR[cite: 21] |
| Total Turnkey (Standard Finishing) | 1,320,000 SAR (Finishing Cost: 1,056,000 SAR)[cite: 21] |
| Total Turnkey (Excellent Finishing) | 1,980,000 SAR (Finishing Cost: 1,584,000 SAR)[cite: 21] |
| Total Turnkey (Luxury Finishing) | 3,960,000 SAR (Finishing Cost: 2,640,000 SAR)[cite: 21] |
| Ground Floor / First Floor Built Area | 420 m² / 360 m²[cite: 21] |
| Upper Annex Built Area | 180 m²[cite: 21] |
| Fence Area / Water Tank / Sewage Tank / Pool | 100 m³ / 40 m³ / 50 m² / 120 m²[cite: 21] |
| Total Building Floor Areas | 1,270 m²[cite: 21] |
Comparison of Construction Costs Across Kingdom Cities
-
Labor and Contractor Prices: Costs rise in major cities like Riyadh due to high demand for certified contracting companies.
-
Soil Nature and Ground Preparation: Some coastal areas (like Jeddah or Al Khobar) require soil replacement or special foundations to resist humidity and groundwater, raising structural phase costs compared to rocky soil regions.
-
Logistics and Material Costs: High supplier availability in cities like Dammam and Riyadh reduces transportation fees for building materials, ready-mix concrete, and heavy equipment.
Disadvantages and Challenges of the Self-Build Journey
-
Exceeding Allocated Budget: Failure to stick to the bill of quantities and continuous design changes during execution lead to higher expenses than expected.
-
Managing Contractors and Labor: Monitoring execution quality and deadline compliance requires significant time and effort, or hiring a reliable engineering supervision office.
-
Delays in Execution Schedule: The journey may face fluctuations in material availability or weather conditions that slow down labor.
Tips Before Starting Construction
-
Relying on Complete Engineering Plans: Do not start execution without detailed plans (architectural, structural, electrical, and plumbing) approved by an engineering office.
-
Clear and Reliable Contracts: Write contracts with specific dates, conditions, and penalties with contractors and supervision offices.
-
Providing a Contingency Margin: Allocate a 10% to 15% margin of the total construction budget to cover any unexpected increases.
Difference Between Self-Build and Turnkey Ready-Made Properties
-
Self-Build: Gives you complete freedom in floor planning, selecting finishing quality, and verifying materials yourself, but requires time and continuous process management.
-
Ready-Made Property: Saves time, effort, and contractor management costs, allowing you to move into your residence immediately without waiting for years.
The Role of Aqar App in Serving You Before and After the Construction Decision
-
Before Building: The app helps you search for residential plots in prime neighborhoods with sizes and budgets that suit you, along with the ability to use the building calculator for advance financial planning.
-
Searching for Ready-Made Real Estate: If you prefer buying ready-made properties and avoiding construction hassle, the Aqar app provides thousands of listed options for villas, floors, and ready apartments for sale across all Kingdom cities at various prices and sizes, with direct communication with owners and certified brokers.
Frequently Asked Questions
Turnkey delivery costs start from 880,000 SAR for a 400m² area, and reach up to 3,960,000 SAR for a 600m² area depending on the finishing level.
The cost of a two-story house is determined based on the building floor areas, with the structural phase (bone) cost alone ranging between 457,600 SAR for a 400m² area and 686,400 SAR for a 600m² area.
The structural phase cost is approximately 230,000 SAR, while the total turnkey delivery cost ranges between 440,000 SAR for standard finishing and 1,320,000 SAR for luxury finishing according to the building calculator.
**
- **
- **
**
**
**
**
**
**
**
**
**
**
**