Construction Certificate vs Occupancy Certificate in Saudi Arabia
Completion of Construction Certificate and Occupancy Certificate in Saudi Arabia: What’s the Difference and How to Obtain Them Online?
The terms Completion of Construction Certificate and Occupancy Certificate raise many questions for owners and developers: What is the role of each certificate? When are they required? And how are they issued through the “Balady” platform? This educational guide explains the concepts, steps, fees, and requirements, and links them to the project timeline from obtaining the building permit to officially operating and using the property.
Why are there two certificates?
- Completion of Construction Certificate: Confirms the construction has been completed in accordance with the building permit, approved drawings, and technical requirements.
- Occupancy Certificate: Authorizes occupying/operating the building (residential/operational) after verifying safety, suitability for use, and utility connections.
The presence of both certificates protects the owner, user, and the market, and facilitates title transfer, utility connections, and financial/financing transactions.
- A valid building permit and approved drawings.
- Compliance with regulations (heights, setbacks, parking, etc.).
- Technical reports from an engineering office (supervision/safety).
- Completion of thermal and waterproofing insulation requirements (review the technical needs).
How does the regulatory pathway of a project proceed?
- Before construction: Cadastral decision → contract with a design office → issue a building permit.
- During execution: Engineering supervision, reports, inspections, adherence to insulation and quality of execution.
- After completion: Apply for the Completion of Construction Certificate via “Balady.”
- For use: Fulfil safety and commissioning requirements, then apply for the Occupancy Certificate.
To understand how finances affect material choices and execution timelines, see Construction Cost in Saudi Arabia: Ideas to Reduce Costs and Calculating Costs & Stages of Construction.
Steps to obtain the Completion of Construction Certificate via “Balady”
- Log in to your “Balady” account.
- Select Building Permits → “New Request” → service to issue a Completion of Construction Certificate.
- Choose the relevant building permit.
- Upload reports from the accredited engineering office (verifying compliance with approved drawings).
- Complete the data and attach the required photos/documents.
- Pay fees online (if applicable).
- Track the status until the Completion of Construction Certificate is issued and available for printing.
Tip: Upload evidence of thermal and waterproofing insulation to close remarks from the first submission (see the “thermal and waterproofing insulation” article above).
Steps to obtain the Occupancy Certificate via “Balady”
- After obtaining the Completion of Construction Certificate, enter “Balady” and select the Occupancy Certificate service.
- Add building data (use/units/parking, etc.) and upload safety reports (electrical/mechanical/fire protection).
- A final inspection visit may be scheduled to verify safety (handrails, exits, ramp slopes, alarm/suppression systems for targeted buildings).
- Pay the fees, then the Occupancy Certificate is issued and linked to the property.
Practical differences between the Completion of Construction Certificate and the Occupancy Certificate
| Item | Completion of Construction Certificate | Occupancy Certificate |
|---|---|---|
| Purpose | Proves execution completion per permit | Legal authorization to occupy the building |
| Timing | Once works are completed | After meeting safety and readiness requirements |
| Uses | Close the building permit file; support for financing/sale | Utility connections; leasing/occupancy/operation |
| Authority | Municipality via “Balady” with engineering office input | Municipality with inspection teams and safety agencies when needed |
Three important financial & legal notes
- When selling after completion, Real Estate Transaction Tax and Exemptions may apply—check exemptions before transfer.
- Proper cost planning reduces delays; see Construction Cost in Saudi Arabia: Ideas to Reduce Costs.
- Organize your documents per Calculating Costs & Stages of Construction to speed up certificate issuance.
FAQs
How do I obtain the Completion of Construction Certificate?
Through the “Balady” platform: log in, select Building Permits, then “Issue Completion of Construction Certificate,” choose your permit, upload engineering office reports and attachments, pay fees, and track until issuance.
What is the difference between the Completion of Construction Certificate and the Occupancy Certificate?
The first confirms completion per the permit and drawings; the second authorizes occupying the building after verifying safety, readiness, and utility connections. Typically, the Completion of Construction Certificate is obtained first, then the Occupancy Certificate.
How much are the fees for the Completion of Construction Certificate?
They are set by the municipality per regulations and may vary by project type and size; fees appear within the “Balady” request before payment.
Is the Completion of Construction Certificate mandatory?
Yes. It closes the building permit and allows moving to the occupancy stage; without it, violations may be recorded and some transactions may be halted.
What happens if I don’t obtain the Completion certificate?
Transactions (title transfer, certain approvals, financing) may be delayed, and remarks/violations may be issued for not closing the permit properly.
What are the conditions for completing construction?
Execution matches approved drawings; compliance with regulations (setbacks, heights, parking); structural/façade safety; and proof of thermal/waterproofing works (see the “thermal and waterproofing insulation” article above).
What are the benefits of the Completion of Construction Certificate?
It documents project completion, increases credibility with financiers/buyers, and allows proceeding to the Occupancy Certificate and utility connections.
What are the new construction procedures?
Practically, a full “Balady” cycle: cadastral decision → design & approvals → building permit → supervision & reports → Completion of Construction Certificate → final safety inspection → Occupancy Certificate. For financial planning, see “Construction Cost in Saudi Arabia: Ideas to Reduce Costs.”
What is the Occupancy Certificate?
An official document allowing residence/operation after verifying compliance with safety systems and utilities. It’s issued via “Balady” after completion.
What’s the difference between the Occupancy Certificate and the Completion of Construction Certificate?
Completion of Construction Certificate = construction completed. Occupancy Certificate = building ready for safe use and utility connections. The second cannot be obtained without the first.
Is the Occupancy Certificate necessary?
Yes. Occupying, leasing, or operating a building is not permitted without a valid Occupancy Certificate.
How much are the Occupancy Certificate fees?
Shown within “Balady” during the application; varies by building type and use, and may include inspection fees where applicable.
What does a title deed with an Occupancy Certificate mean?
It indicates the property is legally owned and authorized for occupancy; having the certificate facilitates financing, leasing, and selling, and simplifies matters related to Real Estate Transaction Tax and Exemptions upon sale or gift.
Quick tips to get approval on the first attempt
- Resolve any discrepancies between execution and drawings before applying.
- Upload all attachments clearly (PDF/JPG) with precise file names.
- Request a preliminary internal inspection with your engineering office before the municipal visit.
- Plan time and cost according to Calculating Costs & Stages of Construction to reduce delays.
- Maintain insulation requirements from early stages to avoid rework.
Conclusion
To stay updated on Completion of Construction Certificate and Occupancy Certificate requirements—from regulatory updates to practical tips—follow the latest news and alerts via the Aqar account on X, where we share quick summaries and real market cases in Saudi Arabia. For in-depth guides and educational articles covering construction stages, costs, taxes, and insulation, bookmark the Aqar Blog and refer to it at every step of your project.