{"id":15383,"date":"2026-10-27T12:17:39","date_gmt":"2026-10-27T09:17:39","guid":{"rendered":"https:\/\/sa.aqar.fm\/blog-be\/?p=15383"},"modified":"2026-10-27T12:17:39","modified_gmt":"2026-10-27T09:17:39","slug":"cost-of-building-two-floors-and-an-annex-in-saudi-arabia-calculate-accurately-with-aqar-calculator","status":"publish","type":"post","link":"https:\/\/sa.aqar.fm\/blog-be\/en\/real-estate-news\/cost-of-building-two-floors-and-an-annex-in-saudi-arabia-calculate-accurately-with-aqar-calculator\/","title":{"rendered":"Cost of Building Two Floors and an Annex in Saudi Arabia: Calculate Accurately with Aqar Calculator"},"content":{"rendered":"<div id=\"model-response-message-contentr_8ebaa68295af11df\" class=\"markdown markdown-main-panel md-content enable-luminous-fast-follows enable-updated-hr-color stronger\" dir=\"ltr\" aria-busy=\"false\" aria-live=\"polite\">\n<div id=\"model-response-message-contentr_3fe929cfb5d34bf7\" class=\"markdown markdown-main-panel md-content enable-luminous-fast-follows enable-updated-hr-color stronger\" dir=\"ltr\" aria-busy=\"false\" aria-live=\"polite\">\n<div>Making the decision to build your dream home in the Kingdom of Saudi Arabia is a crucial step that requires precise financial planning and a comprehensive study of all cost details. From building floor areas to selecting the level of finishing, prospective builders face the challenge of estimating total costs to avoid any financial hurdles during execution.<\/div>\n<div>\n<p>To make this journey easier for you, the Aqar app provides a smart and accurate tool, the &#8220;Building Calculator,&#8221; to estimate the construction cost of your property in mere seconds.<\/p>\n\n<\/div>\n<h2 data-path-to-node=\"4\">Building Calculator from Aqar App: Calculate Accurately<\/h2>\n<div>The building calculator allows you to compute the approximate costs of constructing two floors and an annex based on the land area and the required finishing level (Standard, Excellent, Luxury).<\/div>\n<div><div data-aqar-widget=\"building_calculator\" data-props=\"{}\"><\/div><\/div>\n<div><\/div>\n<div>Using the calculator is very simple and takes just a few quick steps:<\/div>\n<ol start=\"1\" data-path-to-node=\"8\">\n<li>\n<div>Enter the total land area in square meters.<\/div>\n<\/li>\n<li>\n<div>Specify the required number of floors (e.g., two floors with an annex).<\/div>\n<\/li>\n<li>\n<div>Select the desired finishing level to view the cost distribution between the structural phase (Bone) and turnkey delivery.<\/div>\n<\/li>\n<\/ol>\n<h2 data-path-to-node=\"10\">Cost Details of Building Two Floors and an Annex for Different Areas<\/h2>\n<div>According to accurate data from the building calculator on the Aqar app, here are the details of the building floor areas and the total and sub-costs for two of the most requested areas in the Saudi market:<\/div>\n<h3 data-path-to-node=\"12\">1. Cost of Building Two Floors and an Annex on a 400 m\u00b2 Land Area<\/h3>\n<div>The total turnkey cost for building on a 400 m\u00b2 plot ranges from 880,000 SAR for standard finishing up to 2,640,000 SAR for luxury finishing, while the structural phase (Bone) cost alone stands at 457,600 SAR for a total building floor area of 830 m\u00b2[cite: 20, 23].<\/div>\n<div>Here is a table detailing the estimated costs and building floor areas based on the Aqar calculator:<\/div>\n<table data-path-to-node=\"15\">\n<thead>\n<tr>\n<td>Item \/ Phase<\/td>\n<td>Details \/ Cost<\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Structural Phase (Bone) Cost Only<\/td>\n<td>457,600 SAR[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Total Turnkey (Standard Finishing)<\/td>\n<td>880,000 SAR <i data-path-to-node=\"15,2,1,0\" data-index-in-node=\"19\">(Finishing Cost: 704,000 SAR)<\/i>[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Total Turnkey (Excellent Finishing)<\/td>\n<td>1,320,000 SAR <i data-path-to-node=\"15,3,1,0\" data-index-in-node=\"21\">(Finishing Cost: 1,056,000 SAR)<\/i>[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Total Turnkey (Luxury Finishing)<\/td>\n<td>2,640,000 SAR <i data-path-to-node=\"15,4,1,0\" data-index-in-node=\"21\">(Finishing Cost: 1,760,000 SAR)<\/i>[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Ground Floor \/ First Floor Built Area<\/td>\n<td>280 m\u00b2 \/ 240 m\u00b2[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Upper Annex Built Area<\/td>\n<td>120 m\u00b2[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Fence \/ Water Tank \/ Sewage Tank \/ Pool<\/td>\n<td>60 m\u00b3 \/ 25 m\u00b3 \/ 25 m\u00b2 \/ 80 m\u00b2[cite: 20]<\/td>\n<\/tr>\n<tr>\n<td>Total Building Floor Areas<\/td>\n<td>830 m\u00b2[cite: 20]<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 data-path-to-node=\"17\">2. Cost of Building Two Floors and an Annex on a 600 m\u00b2 Land Area<\/h3>\n<div>The total turnkey cost for building on a 600 m\u00b2 plot ranges from 1,320,000 SAR for standard finishing up to 3,960,000 SAR for luxury finishing, while the structural phase (Bone) cost alone stands at 686,400 SAR for a total building floor area of 1,270 m\u00b2[cite: 21, 23].<\/div>\n<div>The following table illustrates the floor area and cost details according to the Aqar app calculator:<\/div>\n<table data-path-to-node=\"20\">\n<thead>\n<tr>\n<td>Item \/ Phase<\/td>\n<td>Details \/ Cost<\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Structural Phase (Bone) Cost Only<\/td>\n<td>686,400 SAR[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Total Turnkey (Standard Finishing)<\/td>\n<td>1,320,000 SAR <i data-path-to-node=\"20,2,1,0\" data-index-in-node=\"21\">(Finishing Cost: 1,056,000 SAR)<\/i>[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Total Turnkey (Excellent Finishing)<\/td>\n<td>1,980,000 SAR <i data-path-to-node=\"20,3,1,0\" data-index-in-node=\"21\">(Finishing Cost: 1,584,000 SAR)<\/i>[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Total Turnkey (Luxury Finishing)<\/td>\n<td>3,960,000 SAR <i data-path-to-node=\"20,4,1,0\" data-index-in-node=\"21\">(Finishing Cost: 2,640,000 SAR)<\/i>[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Ground Floor \/ First Floor Built Area<\/td>\n<td>420 m\u00b2 \/ 360 m\u00b2[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Upper Annex Built Area<\/td>\n<td>180 m\u00b2[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Fence Area \/ Water Tank \/ Sewage Tank \/ Pool<\/td>\n<td>100 m\u00b3 \/ 40 m\u00b3 \/ 50 m\u00b2 \/ 120 m\u00b2[cite: 21]<\/td>\n<\/tr>\n<tr>\n<td>Total Building Floor Areas<\/td>\n<td>1,270 m\u00b2[cite: 21]<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 data-path-to-node=\"22\">Comparison of Construction Costs Across Kingdom Cities<\/h2>\n<div>Actual construction costs on the ground vary slightly across different cities in the Kingdom (such as Riyadh, Jeddah, and Dammam) due to several factors:<\/div>\n<ul data-path-to-node=\"24\">\n<li>\n<div>Labor and Contractor Prices: Costs rise in major cities like Riyadh due to high demand for certified contracting companies.<\/div>\n<\/li>\n<li>\n<div>Soil Nature and Ground Preparation: Some coastal areas (like Jeddah or Al Khobar) require soil replacement or special foundations to resist humidity and groundwater, raising structural phase costs compared to rocky soil regions.<\/div>\n<\/li>\n<li>\n<div>Logistics and Material Costs: High supplier availability in cities like Dammam and Riyadh reduces transportation fees for building materials, ready-mix concrete, and heavy equipment.<\/div>\n<\/li>\n<\/ul>\n<h2 data-path-to-node=\"26\">Disadvantages and Challenges of the Self-Build Journey<\/h2>\n<div>Although self-building allows you to design your home according to your preferences, it comes with challenges to keep in mind:<\/div>\n<ul data-path-to-node=\"28\">\n<li>\n<div>Exceeding Allocated Budget: Failure to stick to the bill of quantities and continuous design changes during execution lead to higher expenses than expected.<\/div>\n<\/li>\n<li>\n<div>Managing Contractors and Labor: Monitoring execution quality and deadline compliance requires significant time and effort, or hiring a reliable engineering supervision office.<\/div>\n<\/li>\n<li>\n<div>Delays in Execution Schedule: The journey may face fluctuations in material availability or weather conditions that slow down labor.<\/div>\n<\/li>\n<\/ul>\n<h2 data-path-to-node=\"30\">Tips Before Starting Construction<\/h2>\n<ol start=\"1\" data-path-to-node=\"31\">\n<li>\n<div>Relying on Complete Engineering Plans: Do not start execution without detailed plans (architectural, structural, electrical, and plumbing) approved by an engineering office.<\/div>\n<\/li>\n<li>\n<div>Clear and Reliable Contracts: Write contracts with specific dates, conditions, and penalties with contractors and supervision offices.<\/div>\n<\/li>\n<li>\n<div>Providing a Contingency Margin: Allocate a 10% to 15% margin of the total construction budget to cover any unexpected increases.<\/div>\n<\/li>\n<\/ol>\n<h2 data-path-to-node=\"33\">Difference Between Self-Build and Turnkey Ready-Made Properties<\/h2>\n<div>Many people hesitate between building their home themselves or purchasing a ready-made property.<\/div>\n<ul data-path-to-node=\"35\">\n<li>\n<div>Self-Build: Gives you complete freedom in floor planning, selecting finishing quality, and verifying materials yourself, but requires time and continuous process management.<\/div>\n<\/li>\n<li>\n<div>Ready-Made Property: Saves time, effort, and contractor management costs, allowing you to move into your residence immediately without waiting for years.<\/div>\n<\/li>\n<\/ul>\n<div>For complete insights into all details, you can read our comprehensive guide on <a href=\"https:\/\/sa.aqar.fm\/blog\/%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1-%D9%88%D8%A7%D9%84%D9%85%D9%82%D8%A7%D9%88%D9%84%D8%A7%D8%AA\/%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1-%D8%A7%D9%84%D8%B0%D8%A7%D8%AA%D9%8A-%D9%85%D8%B1%D8%AC%D8%B9-%D9%84%D9%85%D8%B9%D8%B1%D9%81%D8%A9-%D8%A7%D9%84%D9%85%D8%B2%D8%A7%D9%8A%D8%A7%D8%8C-%D8%A7%D9%84\">Self-Build.<\/a><\/div>\n<h2 data-path-to-node=\"38\">The Role of Aqar App in Serving You Before and After the Construction Decision<\/h2>\n<div>The Aqar app accompanies you through all stages of your residential journey:<\/div>\n<ul data-path-to-node=\"40\">\n<li>\n<div>Before Building: The app helps you search for <a href=\"https:\/\/sa.aqar.fm\/%D8%A3%D8%B1%D8%A7%D8%B6%D9%8A-%D9%84%D9%84%D8%A8%D9%8A%D8%B9\">residential plots<\/a> in prime neighborhoods with sizes and budgets that suit you, along with the ability to use the building calculator for advance financial planning.<\/div>\n<\/li>\n<li>\n<div>Searching for <a href=\"https:\/\/sa.aqar.fm\/%D8%B9%D9%82%D8%A7%D8%B1%D8%A7%D8%AA\">Ready-Made Real Estate<\/a>: If you prefer buying ready-made properties and avoiding construction hassle, the Aqar app provides thousands of listed options for villas, floors, and ready apartments for sale across all Kingdom cities at various prices and sizes, with direct communication with owners and certified brokers.<\/div>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Making the decision to build your dream home in the Kingdom of Saudi Arabia is a crucial step that requires,&#8230;<\/p>\n","protected":false},"author":23,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[4687],"tags":[],"class_list":["post-15383","post","type-post","status-publish","format-standard","hentry","category-real-estate-news"],"lang":"en","aqar_translations":{"en":15383,"ar":15377},"aqar_faq":[{"question":"What is the cost of building two floors and an annex in Saudi Arabia?","answer":"Turnkey delivery costs start from 880,000 SAR for a 400m\u00b2 area, and reach up to 3,960,000 SAR for a 600m\u00b2 area depending on the finishing level.   "},{"question":"What is the cost of building a two-story house?","answer":"The cost of a two-story house is determined based on the building floor areas, with the structural phase (bone) cost alone ranging between 457,600 SAR for a 400m\u00b2 area and 686,400 SAR for a 600m\u00b2 area."},{"question":"What is the cost of building a two-story villa and roof with an area of 200 meters?","answer":"The structural phase cost is approximately 230,000 SAR, while the total turnkey delivery cost ranges between 440,000 SAR for standard finishing and 1,320,000 SAR for luxury finishing according to the building calculator."}],"aqar_seo":{"title":null,"description":"Calculate the cost of building two floors and an annex for 400m\u00b2 and 600m\u00b2 areas accurately using the Aqar app building calculator. Discover total costs for skeleton and finishing, and build or buy with confidence!","canonical":null,"robots":{"noindex":false,"nofollow":false},"og":{"title":null,"description":null,"image":null},"twitter":{"card":"default","title":null,"description":null,"image":null}},"_links":{"self":[{"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/posts\/15383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/comments?post=15383"}],"version-history":[{"count":3,"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/posts\/15383\/revisions"}],"predecessor-version":[{"id":15402,"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/posts\/15383\/revisions\/15402"}],"wp:attachment":[{"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/media?parent=15383"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/categories?post=15383"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sa.aqar.fm\/blog-be\/wp-json\/wp\/v2\/tags?post=15383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}